Commercial Roof Replacement Case Study: Bennett Tools, Vaughan, ON

new glass skylight unit on sloped curb vaughan on

Project Specifications

Project Details

  • Client Name: Bennett Tools
  • Address: Vaughan, ON
  • Project: Complete Roof Replacement – Two Buildings
  • Timeframe: May 2026 completion

 

Client Requirements and Concerns

  • Significantly improve thermal performance (R-value) across both buildings
  • Address excessive internal heat generated by machinery in the rear building
  • Replace all aging acrylic double-dome skylights with new low “e” argon glass units
  • Ensure all roof penetrations and transitions remain compliant with the increased assembly thickness

Existing Roof Conditions

Rear Building

  • Deck type: Steel deck
  • Thermal insulation: 4 inches of ISO insulation
  • Cover board: ½-inch fiberboard
  • Membrane: 4-ply built-up asphalt (BUR) with pea gravel surface
  • Skylights: 12 units (acrylic double-dome)

 

Front Building

The front building comprised two roof levels: a lower office roof and a main (upper) roof. Both levels featured a configuration like the rear building, with the following distinctions:

  • Thermal insulation: 2½ inches of ISO insulation (versus 4 inches on the rear building)
  • Cover board: ½ inch fiberboard
  • Membrane: 4-ply built-up asphalt (BUR) with pea gravel surface
  • Skylights: 16 units (acrylic double-dome)

 

New Roofing System

Insulation Assembly

A high-performance R-50 insulation system was installed across both buildings, consisting of:

  • 8½ inches of polyisocyanurate (polyiso) thermal insulation
  • ½ inch perlite cover board

This represented a substantial increase in thermal insulation depth over the existing assemblies (4 inches on the rear building; 2½ inches on the front building), necessitating coordinated modifications to all existing roof penetrations and curbs.

 

Membrane System

A modified bitumen (mod-bit) system was installed above the new insulation assembly, with materials supplied by Johns Manville:

  • Base sheet: Asphalt-applied modified bitumen base sheet
  • Cap sheet: Thermally fused, torch-welded white granular-surfaced modified bitumen cap sheet

 

Sheet Metal Copings

  • 26-gauge pre-painted sheet metal copings, colour: black, installed on both buildings

 

Skylight Replacement

All existing acrylic double-dome skylights on both buildings (28 units total) were removed and replaced with new glass skylight units. To accommodate the glass glazing and ensure adequate drainage, sloped curbs were fabricated and installed at a minimum 5% slope for proper water runoff.

 

Rear Building — Vented Skylights

Due to the client’s concern regarding heat buildup caused by machinery within the rear building, three of the 12 replacement skylights were specified as openable, vented units. This allows for manual heat relief as required during operations.

After Roof Replacement

Client Goal/Purpose of Project

Key Challenges

Key Challenges and Solutions

The significant increase in insulation thickness rendered the existing HVAC equipment curbs too low relative to the new roof surface. To address this:

  •     An HVAC contractor was engaged with the client’s approval
  •     HVAC curb extensions were fabricated and installed on all units across both buildings
  •     Duct extensions were provided where required to maintain proper connections to the raised curbs

All plumbing vent stacks required upward adjustment to maintain required clearances above the new roof surface. A licensed plumber was retained, with the client’s approval, to complete all vent stack height modifications on both buildings.

The increased insulation depth rendered the existing drainpipe extensions too short to properly interface with the roof drains. New drain connections were made at all roof drains on both buildings to ensure full watertight integration with the new assembly.

All skylight curbs were raised to accommodate the increased insulation thickness. New sloped wood curbs were fabricated at a 5% slope to ensure proper water shedding from the curb framing surfaces, as required for the glass skylight units.

A specific challenge arose at the vertical knee wall separating the lower office roof from the main upper roof on the front building. The following scope was completed to ensure a watertight transition:

  •     The existing cladding on the knee wall was cut back
  •     A metal upstand was fabricated and installed, with insulation fitted behind
  •     A new flashing termination detail was executed at the transition between the two roof levels

Before and During Roof Replacement

Project Outcome

The project was successfully completed in May 2026. The new R-50 assembly substantially improves the thermal envelope of both buildings. The coordinated engagement of subtrades—including HVAC and plumbing contractors—allowed all curb and penetration transitions to be addressed comprehensively within the scope of the roofing project.

The installation of three vented skylights in the rear building provides the client with a practical solution for heat management. The full replacement of all 28 skylights with glass units enhances both daylighting quality and long-term durability compared to the original acrylic domes.

While the actual energy savings have not yet been realized fully, the client says the extra insulation reduces electricity demand at night time. In fact, according to Henry Silberman of Bennett Tools,

“On hot days we used to run the AC 24 hours a day; now we can chill the building at night when the electricity cost is low and we don’t have to cool as much during the day.”

In addition, the client noted that as the weather gets hot and more machines are added to the building, another AC unit will not be required, lowering capital costs further.

The #EliteAdvantage

The roofing system at Bennett Tools was only one part of the equation. The significant increase in insulation thickness required careful coordination of HVAC curbs, ductwork, plumbing vent stacks, roof drains, skylights, and wall transitions to ensure every component remained fully functional and code-compliant. Elite Roofing worked closely with specialized subtrades to manage these complex details and complete the project seamlessly without interfering with building operations. By taking a comprehensive approach rather than focusing solely on the membrane installation, Elite Roofing provided Bennett Tools with a high-performance R-50 roofing system, improved energy efficiency, enhanced daylighting, and long-term protection.

That’s the Elite Advantage!