Building Height: 2 storeys
Total Area: 7,650 sq. ft.
Existing Substrate: 16GA Z-Girts
Vapour Retarder: N/A
Original Insulation: Foil faced fiberglass insulation
New Scope of Work: Remove existing wall panels and dispose, existing insulation to remain, new insulation installed in damaged areas only.
New Metal Siding: New cladding – Agway 1.5” – HF-12 siding panels secured to existing z girts.
We worked closely with the GC to coordinate site access, which was complicated by the relocation of several services near the building.
Managing the timeline was complex, as we had to schedule our work around ongoing training sessions at the school.
A staged evaluation of the existing conditions was necessary to properly determine the method for installing the new windows and securing the lower cladding.
Due to the building’s location, there was extremely limited space on the ground for equipment, debris disposal, and material staging.
These challenges required us to adjust our approach, modify workflows, and implement site-specific solutions in order to complete the work safely and on time. We attribute much of this project’s success to the factors below.
Our ability to deliver complex roofing projects safely, efficiently, and with minimal disruption – no matter the obstacles – is a top reason our clients trust us as their commercial roofing contractor. At 1750 Finch Avenue East, we had to navigate limited ground space, multi-stage construction, a complex timeline, and coordination of site access – all while keeping the building operational with minimal disruption to students and instructors.
However, guided by detailed planning, clear coordination, and adaptive problem-solving, we were able to complete the original scope of work within the stated timeline for this complex commercial metal siding installation project. Backed by strong project leadership and consistent commitment to our client’s priorities, the team at Elite Roofing was able to adapt to the significant challenges that came our way. That’s the Elite Advantage!