Building Height: 25’ – 30’
Total Roof Area: 32,317 sq.ft. for (4) buildings
Deck substrate: Steel deck
Vapour retardant: Asphalt reinforced kraft paper applied in cold adhesive
Insulation: Two layers of 3.0” ISO plus 0.5” JM perlite board
Membrane Type: 4 ply BUR (1 ply #15 and 3 plies type 4 glass felt)
Ballast: Gravel
Flashings: 2 plies SBS modified bitumen including a granular surfaced cap sheet
Metal Coping: 24 gauge pre-painted metal
The project was completed in phases requiring multiple mobilizations by our crews.
Due to construction site scheduling requirements, key areas of the buildings were ready for us at different times which required detailed planning on our end to meet the client’s needs. The design changes involved planning several mobilizations of smaller crews to maintain a more detailed focus, and to make the changes in a more efficient and cost effective manner while keeping the client’s budgetary and tight scheduling needs in mind.
Changes to some building elements were implemented throughout the construction cycle which involved replacement/alteration of already installed roofing/siding elements.
Tie-in to the roof section completed by others was challenging, as the TPO membrane installed by the grocery store’s contractor was not compatible with the BUR membrane selected by our client. We were asked to propose and design the tie-in details for review and approval by the project’s consultants to ensure proper waterproofing and warranty requirements were met. Once the details were approved by both the consultants and roof warranty holders we dutifully executed them in a proper tradesman-like manner.
Some buildings had more than 100 HSS columns penetrating the roof for the screening of HVAC units.
Scheduling issues were associated with the project length, and the need for multiple mobilizations as the buildings in the project were ready for roofing at different times.
The Elite team went the extra mile to resolve the many issues we encountered during the project. From the skill of our workers to our close relationship with the manufacturers, we met and exceeded the goals of the project despite the challenges and unanticipated setbacks.
We attribute much of the success of the project to the factors below:
Successful planning and implementation of new construction roofing for a multiple building property always has its challenges and risks. With so many buildings involved, anything can and does happen. Our roofers had to adapt and adjust as needed on the job site to ensure we delivered on our promises outlined at the beginning of the project.
When hiring a roofing contractor, it’s important to choose a reputable company with relevant experience. It’s also important to hire one with the technical knowledge to execute the original scope of work while having the ability to overcome unexpected challenges on the fly. Elite Roofing brings a commitment for excellence to every job site as we align our skills with your priorities and vision.