Type of Project: Partial Roofing Replacement
Square Footage: 9,400
Roof Membrane (Field Area) and Flashing Membrane: 2-Ply SBS Modified Bitumen
Insulation: 3″ ISO, tapered insulation, 0.5″ High-Density Perlite-Based Cover Board
Deck Type: Concrete
When recommending a roofing membrane for our clients, there are multiple factors to take into consideration. The 2-ply SBS modified bitumen membrane is a reliable and energy-efficient choice, but it’s not the only reason why we chose this option. The future building use and design was a factor when choosing this particular membrane. Relatively low staging impact and low degree of impact regarding ongoing use of the building made a fully adhered SBS membrane an easy choice for this structure.
From the outset, the team crafted a phased execution plan that divided the project into manageable stages. This approach allowed for the systematic removal of the existing roof and installation of the new system without disrupting operations. Milestones were set for each phase, ensuring steady progress and adherence to the client’s tight schedule. Contingency plans were also prepared to address potential delays caused by weather or supply chain issues.
Close collaboration with the client was integral to the project’s success. Weekly progress meetings were held to review milestones, discuss any adjustments, and keep the client informed. By maintaining transparency and seeking client input at every stage, the team ensured that the project scope remained aligned with the client’s expectations and priorities.
The choice of a 2-ply SBS modified bitumen membrane was a key planning decision. This system not only met the client’s need for energy efficiency but also provided superior durability and resistance to weather conditions. The use of tapered insulation ensured effective water drainage, further enhancing the roof’s long-term performance. These carefully selected materials reflected a commitment to quality and functionality, meeting both immediate project needs and future requirements.
This project began at the height of the COVID-19 pandemic, demanding strict adherence to safety protocols. The Elite team implemented comprehensive health measures, including mandatory PPE, social distancing on-site, regular health checks, and enhanced sanitation practices. These measures were critical not only for protecting workers but also for ensuring the safety of the Canadian National Railway staff who remained on-site. The seamless execution of these protocols allowed the project to move forward without incident, meeting all government and industry safety standards
The project was under a time-sensitive deadline to ensure the roof replacement was completed before the office reopened. Planning was complicated by the operational constraints of a partially active office building. Maintaining uninterrupted workflows for the client required detailed scheduling and phased project management. The team carefully sequenced the work, focusing on the most critical sections of the roof while ensuring minimal disruption to on-site operations.
The site offered limited space for staging equipment and materials, presenting logistical challenges. With no room for inefficiencies, the team implemented a just-in-time delivery approach. Materials were delivered in small, precise shipments to minimize clutter and keep the project site organized. Additionally, innovative use of tools like an external-mounted trash chute and crane operations streamlined debris removal and equipment placement, maximizing space utilization without disrupting the site’s functionality.
Delivering a successful partial roof replacement for the Canadian National Railway offices required innovative solutions to address the challenges at hand. By leveraging expertise and maintaining open communication with the client, the Elite team ensured a seamless project execution.
If you’re looking for a trusted roofing partner contact Elite Roofing. Elite Roofing is a multiple-award-winning recipient of the Industrial Roofing Safety Performance Award and is proud to provide in-house training to its employees to ensure your project goes off without a hitch. We’re available 24/7 to answer all of your roofing questions. That’s the Elite Advantage.