Partial Roof Replacement for the Toronto Roundhouse

Partial Roof Replacement for the Toronto Roundhouse: An aerial view of the historic Toronto Roundhouse showcasing the newly completed partial roof replacement by Elite Roofing, preserving the building's iconic curved design.

Project Specifications

Commercial/Retail Space Partial Roof Replacement Client     Toronto Roundhouse roof Replacement - Elite Roofing and Contractors Limited

Address:

255 Bremner Blvd.

Toronto, Canada

Scope of Work

  • Removal and disposal of existing “coal tar pitch” roof down to the wood substrate.
  • Vapour retardant: 2 ply reinforced kraft paper with adhesive.
  • Base layer of Insulation: 3.0″ ISO mechanically fastened.
  • Insulation overlay: 0.5″ coated fibreboard applied in hot asphalt.

Building uses: Toronto Railway MuseumSteam Whistle Brewery

Client Goal/Purpose of Project

The client sought a partial roof replacement for the historic Roundhouse building, prioritizing the preservation of its heritage elements while addressing critical roofing issues. The goal was to ensure the structure’s long-term protection and functionality without compromising its architectural integrity. The project required thoughtful planning and execution to align with stringent heritage guidelines, ongoing business operations, and the complex design of the building itself.

Key Challenges

Working on a heritage building like the Roundhouse required navigating unique challenges that blended the demands of preserving historical elements with modern roofing standards. From managing ongoing business operations to ensuring structural integrity, each step of the project called for precision, collaboration, and innovative problem-solving.

Planning Challenges

The roof replacement had to align with other renovations occurring in the building, necessitating a phased approach that minimized disruption while maximizing efficiency.

Given the heritage status, the planning phase required sourcing and utilizing materials that matched the original elements of the building while meeting modern performance standards.

Close coordination with architects, technical experts, and the client was essential to meet project specifications and adhere to heritage requirements.

Management & Execution

Maintaining the building’s heritage designation required careful handling of the original structure and materials, particularly the visible wood substrate beneath the roof. Rotten wood had to be replaced with matching materials to retain its appearance and structural integrity.

Roofing work was carried out while the Steam Whistle Brewery continued its operations, including the event space, restaurant, and outdoor patio. This required interior tarping to protect ongoing activities from construction debris or disruption.

The existing coal tar pitch residue caused issues with base sheet membrane adhesion. Custom solutions were necessary to ensure the roofing layers bonded securely without compromising durability.

The unique architectural layout of the roof demanded precise membrane installation to ensure proper drainage and water management.

Completed Roof at Toronto Roundhouse

These images capture the finished roof of the Toronto Roundhouse after the partial replacement.

Solutions for the Toronto Roundhouse Partial Roof Replacement

Addressing the challenges of this project required a tailored approach that balanced the needs of the heritage building, ongoing operations, and roofing functionality. Each solution was designed to maintain the building’s historical integrity while ensuring a durable, watertight roof system.

Rotten wood sections were replaced with specialized lumber that matched the original tongue-and-groove substrate, preserving the visible aesthetics from the interior while restoring structural stability.
Collaborating with IKO’s technical team, we developed a detailed solution to address adhesion challenges caused by coal tar pitch residue. Asphalt protection boards were installed, and base flashing membranes were carefully applied to ensure a secure bond.
To support the brewery’s uninterrupted operations, we installed tarping systems to safeguard interior spaces, allowing business activities to continue seamlessly.
A multi-stage approach was adopted to align with ongoing renovations and minimize disruptions, ensuring smooth coordination across all project areas.
The roof’s curved and sloped design was addressed by meticulously laddering materials starting at drains and eaves, optimizing water management while adhering to the building’s unique architecture.
Regular coordination with the client, architects, and project stakeholders ensured that all work met the heritage and functional requirements, earning commendation from the Roundhouse Development Corporation.